Factory Acceptance for a Crate: What to Sign Off Before Shipping
Sign Off Where Correction Is Cheap
A crate defect found at the destination costs freight both ways and a delay. The same defect found in the factory costs an hour.
A factory acceptance test is a short checklist executed at the supplier, with records taken away.
It is particularly valuable for a first order or a design change.
Dimensional Check
Measure the external dimensions, the internal clearances and the panel thickness on at least three crates.
Internal clearance matters more than external dimensions, because it decides whether the product fits with its blocking.
Record the measurement method. Two parties measuring differently will disagree.
Assembly Check
Assemble one crate at the supplier and time it. The assembly time is a commitment the receiving plant has to live with.
Check fastener count and position against the drawing, and confirm the joint closes without force.
Photo the assembled corner joints. Joint quality is hard to describe and easy to photograph.
Load Test
Load the crate to the rated load and hold for 24 hours if the schedule allows, or apply the rated load with a compression rig.
Measure deflection at mid-span and at the corners. A deflection above the design limit is a fail even without damage.
If a full 24-hour test is impossible, apply the load and measure after one hour, and state clearly that the test was shortened.
Documentation
Collect the panel specification, the adhesive declaration, the fastener specification and the assembly drawing.
For export, add the compliance documents for the destination market.
A crate without documentation cannot be re-ordered accurately, and the second order will differ from the first.
Photographs
Photograph the crate from all four sides, the top, the base and each corner joint, with a scale in the frame.
Date the photographs. They become the reference for every subsequent shipment.
A claim about a change in quality needs a baseline photograph, and this is the moment to take it.
Sign-Off
Record pass, fail and any waiver with a reason. A waiver is a decision and should be documented.
Sign the acceptance report with both parties' names and the date.
Keep the report with the purchase order. It is the reference document for the program.
Questions Buyers Ask
What does a crate factory acceptance test cover?
Dimensional check, assembly check with timing, a load test to the rated load, documentation and dated photographs.
Why does internal clearance matter more than external dimensions?
Because it decides whether the product fits with its blocking. External dimensions can be correct while the internal space is wrong.
What deflection limit should be used?
The design limit stated in the crate specification. A deflection above it is a fail even if no damage is visible.
What documentation should be collected?
Panel specification, adhesive declaration, fastener specification, assembly drawing and any export compliance documents.
Why photograph with a scale and a date?
Because it becomes the baseline for later shipments. A quality claim needs a reference to compare against.
Next Step
Send the crate specification and the delivery date. You will receive a factory acceptance checklist with the records to collect, in one reply.
See also honeycomb paper factory direct.
See also honeycomb paper for sale.
See also honeycomb cardboard price list.